Winsome Farms
Wellington, Florida
An
84 acre Private Equestrian Estate involving Clearing and
Grubbing of the 84 acre site, onsite Excavation of 850,000
cubic yards of fill material including muck removal, Storm
Drainage, Roadways and Water Distribution.
We
were, from the beginning of this project, responsible for
overall coordination between all principals (architects,
engineers, builders, etc.) , involved in project completion
- in addition, we dealt with the Owner on matters of
personal consideration.
We
also were involved in the design of all Equestrian Rings.
This includes the selection and combinations of the various
materials used for both Sand and Grand Prix Rings.
Project Manager
Dave Kirby
Isla Carroll Farms
Wellington, Florida
An
80 acre Private Polo Estate involving Heavy Clearing and
Grubbing of the 80 acre site, onsite Excavation of 350,000
cubic yards of muck and fill, Storm Drainage installation,
road and parking lot construction totaling 15,000 square
yards.
John Goodman, Owner
Everglades Polo
Wellington, Florida
Development of an 80 acre Polo Estate
consisting of 6 - 10 acre tracts, an International Polo
Field and exercise track. Began construction 09-21-96.
Completed Polo field 01-15-97. On-site excavation produced
six 2.0 acre lakes. Excavation operation consisted of
200,000 cubic yards of on site muck disposal, 400,000 cubic
yards rock excavation and 400,000 cubic yards sand backfill.
Total excavation of one million cubic yards. Project
included all storm drainage access and interior roads, and
primary landscaping.
Forest Hill Construction Co., Inc. was
involved from the beginning of preliminary design and
responsible for all of the project management duties.
S.K. Johnston, Jr., S.K. Johnston, III,
& Orrin Ingram, Owners
Hayne Hamilton, Representative
Gulfstream Polo
Wellington, Florida
Provided engineering, permitting, surveying,
complete design and construction for the renovation and
upgrade to all weather, International status of the existing
Bostwick and Azequeta fields, Project services also included
the sprigging of 419 Bermuda and preparation of manual of
recommended maintenance procedures to Owners.
Garrick Steele, Representative
Catawaba Corporation
11911 Freedom Drive, Suite 1050
Reston, VA 22314
Turnabout Farms
Wellington, Florida
Site work for this 5-acre Equestrian
Facility consists of construction of a Sand Ring, Turf Ring
and Lunging Rings in addition to Bunker and Water Jumps.
Installed Paddock Access Trails and Bridle Paths.
Associated site work included De-mucking,
Pad Construction, Storm Drainage, Roadways, Irrigation,
Sodding and Finish Grading.
Dr. Ann Meyer, Owner
Quimby Lane Farms Polo Field
Palm Beach Point East
Wellington, Florida
25
acre Private Polo Facility, included Clearing and Grading,
Storm Drainage construction and the importing of 100,000
cubic yards of fill material.
Mickey Tarnopol, Owner
Van Andel Estate
Wellington, Florida
A
60 acre Private Polo Estate. Responsible for clearing the
site and the Earthwork. Earthwork included the Removal of
approximately 650,000 cubic yards of extensive hard rock
excavation in a 7 acre lake. Underground Utilities, Lake
Excavation, Final Grading and all Seeding and
Sodding.
Steve Van Andel, Owner
Forest Hill Construction Company, Inc.
17546 Bee Line Highway
Jupiter, Florida 33478
Tel: (561) 790-2300 Fax: (561) 799-5650
U.S. Toll Free: 1-800-537-3031
E-mail
Lic. #CGC024777