Winsome Farms
Wellington, Florida

An 84 acre Private Equestrian Estate involving Clearing and Grubbing of the 84 acre site, onsite Excavation of 850,000 cubic yards of fill material including muck removal, Storm Drainage, Roadways and Water Distribution.

We were, from the beginning of this project, responsible for overall coordination between all principals (architects, engineers, builders, etc.) , involved in project completion - in addition, we dealt with the Owner on matters of personal consideration.

We also were involved in the design of all Equestrian Rings. This includes the selection and combinations of the various materials used for both Sand and Grand Prix Rings.

Project Manager
Dave Kirby

 

Isla Carroll Farms
Wellington, Florida

An 80 acre Private Polo Estate involving Heavy Clearing and Grubbing of the 80 acre site, onsite Excavation of 350,000 cubic yards of muck and fill, Storm Drainage installation, road and parking lot construction totaling 15,000 square yards.

John Goodman, Owner

 

Everglades Polo
Wellington, Florida

Development of an 80 acre Polo Estate consisting of 6 - 10 acre tracts, an International Polo Field and exercise track. Began construction 09-21-96. Completed Polo field 01-15-97. On-site excavation produced six 2.0 acre lakes. Excavation operation consisted of 200,000 cubic yards of on site muck disposal, 400,000 cubic yards rock excavation and 400,000 cubic yards sand backfill. Total excavation of one million cubic yards. Project included all storm drainage access and interior roads, and primary landscaping.

Forest Hill Construction Co., Inc. was involved from the beginning of preliminary design and responsible for all of the project management duties.

S.K. Johnston, Jr., S.K. Johnston, III, & Orrin Ingram, Owners
Hayne Hamilton, Representative

 

Gulfstream Polo
Wellington, Florida

Provided engineering, permitting, surveying, complete design and construction for the renovation and upgrade to all weather, International status of the existing Bostwick and Azequeta fields, Project services also included the sprigging of 419 Bermuda and preparation of manual of recommended maintenance procedures to Owners.

Garrick Steele, Representative
Catawaba Corporation
11911 Freedom Drive, Suite 1050
Reston, VA 22314

 

Turnabout Farms
Wellington, Florida

Site work for this 5-acre Equestrian Facility consists of construction of a Sand Ring, Turf Ring and Lunging Rings in addition to Bunker and Water Jumps. Installed Paddock Access Trails and Bridle Paths.

Associated site work included De-mucking, Pad Construction, Storm Drainage, Roadways, Irrigation, Sodding and Finish Grading.

Dr. Ann Meyer, Owner

 

Quimby Lane Farms Polo Field
Palm Beach Point East
Wellington, Florida

25 acre Private Polo Facility, included Clearing and Grading, Storm Drainage construction and the importing of 100,000 cubic yards of fill material.

Mickey Tarnopol, Owner

 

Van Andel Estate
Wellington, Florida

A 60 acre Private Polo Estate. Responsible for clearing the site and the Earthwork. Earthwork included the Removal of approximately 650,000 cubic yards of extensive hard rock excavation in a 7 acre lake. Underground Utilities, Lake Excavation, Final Grading and all Seeding and Sodding.

Steve Van Andel, Owner

Forest Hill Construction Company, Inc.
17546 Bee Line Highway
Jupiter, Florida 33478
Tel: (561) 790-2300 Fax: (561) 799-5650
U.S. Toll Free: 1-800-537-3031

E-mail

 Lic. #CGC024777